Shadow Checker 影 子 审 图
Drop a drawing package, or click to browse
Entire packages welcome — multi-discipline, multi-sheet. Cross-validation happens across all uploaded files.
DWG · DXF · IFC · PDF · ZIP · MAX 500MB PER PACKAGE
// CODE SYSTEMS multi-select
GB国标 BS Eurocode ACI IS Custom
// DISCIPLINES multi-select
Structural Hydraulic Electro-mechanical Architectural Geotechnical
Active & recent reviews
dam_structural_package_v3.zip
REVIEWING · 68%
CODES:GB · BS DISC:Structural · Hydraulic SHEETS:142 STARTED:3m ago
2 CRITICAL 7 WARN 14 NOTICE Findings so far →
powerhouse_mep_drawings.dwg
REVIEW COMPLETE
CODES:GB · Eurocode DISC:Electro-mechanical SHEETS:38 FINISHED:14m ago
1 CRITICAL 4 WARN 9 NOTICE Open report →
penstock_layout_lot2.dxf
REVIEW COMPLETE
CODES:BS · ACI DISC:Structural · Hydraulic SHEETS:24 FINISHED:2h ago
2 WARN 6 NOTICE Open report →
powerhouse_mep_drawings.dwg
GB EUROCODE
// FINDINGS · 14 TOTAL
F-001 CRITICAL
Clearance between cable tray and hot piping below required minimum — thermal separation violates clause.
GB 50217-2018 · §5.4.2 → measured 180mm / required 300mm
F-002 WARN
Grounding busbar cross-section appears undersized for stated fault current. Review against loading calc.
GB 50169-2016 · §4.3 · cross-check with calc sheet 04-C-12
F-003 WARN
Annotation inconsistency: symbol "M-08" used for both motor and metering point across sheets 12 & 17.
Symbol registry · internal
F-004 NOTICE
Layer naming on sheet 22 deviates from project standard (MEP_P_E03 vs MEP-P-E03).
Project CAD standard §2.1
F-005 NOTICE
Lighting fixture count on sheet 31 does not match schedule total (48 vs 46).
Schedule cross-check
F-006 NOTICE
Dimension string on sheet 7 missing tolerance band.
Eurocode EN 1090-2 · §6.5
// SHEET 14 · MEP SECTION A-A
CABLE TRAY CT-01 HOT PIPE HP-14 (110°C) 180mm M-08 M-08 A B C D
1
2
3
3
4
// Findings are proposed by Shadow Checker. Human sign-off remains with your team.