Drop a drawing package, or click to browse
Entire packages welcome — multi-discipline, multi-sheet. Cross-validation happens across all uploaded files.
DWG · DXF · IFC · PDF · ZIP · MAX 500MB PER PACKAGE
// CODE SYSTEMS
multi-select
GB国标
BS
Eurocode
ACI
IS
Custom
// DISCIPLINES
multi-select
Structural
Hydraulic
Electro-mechanical
Architectural
Geotechnical
Active & recent reviews
dam_structural_package_v3.zip
REVIEWING · 68%
2 CRITICAL
7 WARN
14 NOTICE
Findings so far →
powerhouse_mep_drawings.dwg
REVIEW COMPLETE
1 CRITICAL
4 WARN
9 NOTICE
Open report →
penstock_layout_lot2.dxf
REVIEW COMPLETE
2 WARN
6 NOTICE
Open report →
powerhouse_mep_drawings.dwg
GB
EUROCODE
// FINDINGS · 14 TOTAL
F-001
CRITICAL
Clearance between cable tray and hot piping below required minimum — thermal separation violates clause.
GB 50217-2018 · §5.4.2 → measured 180mm / required 300mm
F-002
WARN
Grounding busbar cross-section appears undersized for stated fault current. Review against loading calc.
GB 50169-2016 · §4.3 · cross-check with calc sheet 04-C-12
F-003
WARN
Annotation inconsistency: symbol "M-08" used for both motor and metering point across sheets 12 & 17.
Symbol registry · internal
F-004
NOTICE
Layer naming on sheet 22 deviates from project standard (MEP_P_E03 vs MEP-P-E03).
Project CAD standard §2.1
F-005
NOTICE
Lighting fixture count on sheet 31 does not match schedule total (48 vs 46).
Schedule cross-check
F-006
NOTICE
Dimension string on sheet 7 missing tolerance band.
Eurocode EN 1090-2 · §6.5
// SHEET 14 · MEP SECTION A-A
1
2
3
3
4